Previous - 159. Start to finish, Under the building
The back yard, start to finish:
-
Overview of deck/yard:
Before vine cleared from side fence and fire escape.
After vine cleared (by Ted).
While cleaning up deck.
Here is our back deck after I cut back the vine and had all the junk hauled away.
While work site.
Back of the building before the new heater installed
After the deck was removed.
With new gravel over tarps (by Ted).
2. The hole in the south wall cut for the support beam:
Showing the beam in place.
Temp patch.
Wall patched.
Wall painted (by Ted).
3. The basement door:
Old door removed.
Old door removed for easier access to basement.
New door by SR.
Painted (by Ted).
4. The back door:
Bottom of door sawed off to make clearance for plywood protecting carpet.
New kick-plate by SR (painted by Ted).
Door painted to cover retrofit wear and tear (by Ted).
With exit sign.
END
Overview of deck/yard:
No comments:
Post a Comment