Under the building, start to finish:
Preparing for rear “beam”
Looking NE under unit #7 with tank on right.
Preparing for middle beam under unit #7
Almost ready to pour rear beam.
Middle beam poured
Rear beam poured
Rear beam
Middle beam
Reinforced wood beam under #7
New shear wall between back area and tank/pumps. Concrete “beam” lower right.
NE view showing new shear wall above middle beam and other reinforcing, continued below.
Sanitary tank with pump pipes above and drain pipes. New shear wall on right. New concrete beam on left.
Brackets and shear wall on west wall
South wall showing beam below and reinforcing above.
END