159. Start to finish, Under the building


Previous - 158. Start to finish, Laundry room



Under the building, start to finish:


SAM_0146_zpsdbs3z5bl.jpg
Preparing for rear “beam”


SAM_0147_zpsrlosa7vx.jpg
Looking NE under unit #7 with tank on right.


SAM_0165_zps7hpg3bfu.jpg
Preparing for middle beam under unit #7


SAM_0167_zpsgqrttlwy.jpg
Almost ready to pour rear beam.


SAM_0183_zpspcrqf0y1.jpg
Middle beam poured


SAM_0184_zpsmsidqxd4.jpg
Rear beam poured


SAM_0186_zpsneaz1dly.jpg
Rear beam


SAM_0188_zpsrcon50yi.jpg


SAM_0187_zps8xx32mns.jpg
Middle beam


SAM_0189_zpsrdyrbqqe.jpg
Reinforced wood beam under #7


SAM_0281_zpsytfz8rog.jpg
New shear wall between back area and tank/pumps. Concrete “beam” lower right.


SAM_0282_zpszsjsrzex.jpg
NE view showing new shear wall above middle beam and other reinforcing, continued below.


SAM_0286_zps83d2vj9o.jpg


SAM_0283_zpspmxuknrn.jpg
Sanitary tank with pump pipes above and drain pipes. New shear wall on right. New concrete beam on left.


SAM_0285_zpspuoa8kay.jpg
Brackets and shear wall on west wall


SAM_0287_zps5rdqgfn0.jpg
South wall showing beam below and reinforcing above.


END